Recovering with the use of the ResetPlan command
Perform these steps on the master domain manager:
- Set the job "limit" to “0”, using conman or the Dynamic Workload Console.
This prevents jobs from launching.
- Shut down all IBM Workload Scheduler processes on the master domain manager.
- Run ResetPlan -scratch.
- Run JnextPlan, setting the -from and -to parameters to cover the period for which there are still outstanding jobs.
- Check the created plan and ensure that you want to run all the instances it contains, deleting those that you do not want to run.
- Reset the job "limit" to the previous value. The Symphony file is distributed and production recommences.