Start up and shut down IBM Workload Scheduler

About this task

The following methods can no longer be used to stop IBM Workload Scheduler because they will cause a failure of the IBM Workload Scheduler cluster resource:
  • Conman shut
  • Shutdown.cmd
  • StartUp.cmd
  • Conman start if the ITWSWorkstation resource is offline.
  • StartupLwa.cmd
Use the following scripts to stop and start IBM Workload Scheduler (you can rename then if required):
  • ShutDown_clu.cmd
  • StartUp_clu.cmd
  • ShutDownLwa.cmd

The above scripts will be automatically created under the IBM Workload Scheduler installation directory by the twsClusterAdm.exe program.

If you do not use these scripts, you must run the following commands to stop and start IBM Workload Scheduler services.