Installation checklist

About this task

To activate the end-to-end scheduling with fault tolerance capabilities in IBM Z Workload Scheduler, follow these steps:

Procedure

  1. Run EQQJOBS and specify Y for the END-TO-END WITH FAULT TOLERANCE field. For details, see Step 1. Specifying fault-tolerant end-to-end scheduling information in EQQJOBS.
  2. Generate batch-job skeletons. For details, see Step 2. Generating batch-job skeletons.
  3. Allocate the data set running the generated EQQPCS06 sample. For details, see Step 3. Running the generated sample to allocate the end-to-end data sets.
  4. Create and customize the work directory by running the generated EQQPCS05 sample. For details, see Step 4. Creating and customizing the work directory.
  5. Create JCL procedures for address spaces. For details, see Step 5. Creating JCL procedures for address spaces.
  6. Customize the PARMLIB members. For details, see Step 6. Customizing the PARMLIB members.
  7. Define the fault-tolerant workstations in the IBM Z Workload Scheduler workstation description database. For details, see Step 7. Defining the fault-tolerant workstations.
  8. Verify your installation. For details, see Step 8. Verifying your installation.