Displaying counter data in tables or as graphs
You can display the statistics of counters in a table view or a graphical view so that you can analyze the counters information efficiently.
Before you begin
- Created and ran the test or schedule.
- Added counters on a separate page and renamed the page. See Adding additional counters on a separate page.
Procedure
-
Double-click the test or schedule report
in the Test Navigator.
The Performance Report is displayed.
-
Click the page you created and renamed.
The counters that you added are displayed in a graph in the right pane. The default chart is the line chart.
-
Click the Settings icon to modify the view for the counter.
The available controls are displayed in the Options section.
-
Select one of the following options depending on the chart type that you want
to view in the graph:
- Lines chart
- Bars chart
- Pie chart
- Table
-
Modify the following parameters for the view you select:
Options Description Lines Bars Pie Table Title Displays a title you enter for the graph ✓ ✓ ✓ ✓ Show legend Enables you to select the position where you want the legend to be displayed in the graph. ✓ ✓ ✓ ✘ Color items Displays the selected option as a color item in the legend. The available options are as follows: - Pages
- Transactions
- Resources
- Counters
Note: Depending on the test element that you add in your test or schedule, the preceding options are available.✓ ✘ ✘ ✘ Dash items Displays the selected option as a dashed item in the legend. The available options are as follows: - Pages
- Transactions
- Resources
- Counters
Note: Depending on the test element that you add in your test or schedule, the preceding options are available.✓ ✘ ✘ ✘ Source Enables you to select the information of counters in the graph by its source type. The available options are as follows: - All sources
- Load agents
- Resource monitoring
✓ ✓ ✓ ✘ Adapt Y scale on selection Select the check box to compute the minimum and maximum limits on the Y-axis. ✓ ✓ ✓ ✘ Palette Displays the predefined color combination for the legend in the graph. Note: The requirements report always uses verdict colors.✓ ✓ ✓ ✘ Adapt Y scale on zoomed data Select the check box to adjust the Y scale according to zoomed data. ✓ ✘ ✘ ✘ Show time ranges Select the check box to display the time range in the background of the graph. ✓ ✘ ✘ ✘ X axis unit Enables you to select the options that you want to view as the X axis unit in the graph. ✓ ✘ ✘ ✘ Line smoothing Clear the check box to apply corners in the graph. ✓ ✘ ✘ ✘ Time line visibility Enables you to select the options that you want to view as the time line of the graph. The available options are as follows: - None: The time line is not visible and you cannot create a new time range in the graph.
- Small (faster): The time line of the graph is in partial view.
- Full (draw curves slower): The time line of the graph is in full view.
Note: When you select Small (faster) or Full (draw curves slower) option, you can drag the time line to create a new time range on the graph.✓ ✘ ✘ ✘ Individual scale for each Sets the scale for each counter when multiple counters are displayed simultaneously. The available options are as follows: - Unit
- Counter
- Result/Host/Geo
✓ ✓ ✘ ✘ X Axis Main Items Displays the selected option in the X axis. The available options are as follows: - Not assigned
- Counters
- Time ranges/Results/Hosts/Geos
✘ ✓ ✘ ✘ X Axis Secondary Items Displays the selected option in the X axis as a secondary item. ✘ ✓ ✘ ✘ Stacked Items Displays the selected option as stack instead of separate bars in the graph. For example, when you select Counters for X-axis Main Items and Time ranges/Results/Hosts/Geos for X axis Secondary Items, the other option Not assigned is selected for Stacked Items.
✘ ✓ ✘ ✘ Show values Displays the value of counters in the graph. ✘ ✓ ✘ ✘ Orientation Enables you to select orientation to view bar charts horizontally or vertically. ✘ ✓ ✘ ✘ Labels display policy Displays the labels in the graph. The available options are as follows: - Hidden: To hide the labels in the bar chart
- Adaptative: To be able to accommodate labels within the frame of the bar chart
- Fixed: To display the fixed
labels.Note: If you select Fixed, long labels might not be visible.
✘ ✓ ✘ ✘ Show values axis Clear the check box to remove the values from the Y-axis in the graph. ✘ ✓ ✘ ✘ Horizontal bar thickness Use an up-down control button to increment or decrement the thickness of the horizontal bar in the graph. Note: The maximum value you can set is 50.✘ ✓ ✘ ✘ Donut items Displays the selected option as a Pie chart in the graph: - Counters
- Time ranges/Results/Hosts/Geos
✘ ✘ ✓ ✘ Arc items Displays the selected option as an Arc in the graph. For example, when you select Counters for Arc items, then the other option Time ranges/Results/Hosts/Geos is selected for Donut items and vice-versa.
✘ ✘ ✓ ✘ Pie style Displays the graph either in the format of Pie or Donut. ✘ ✘ ✓ ✘ Row items Displays the selected information in the row of a table. The available options are as follows: - Not assigned
- Counters
- Time ranges/Results/Hosts/Geos
✘ ✘ ✘ ✓ Column items Displays the selected information in the column of the table. ✘ ✘ ✘ ✓ Group items Displays the selected option information in the group. For example, when you select Counters for Row items and Time ranges/Results/Hosts/Geos for Column items, the other option Not assigned is selected for Group items.
✘ ✘ ✘ ✓ Draw mini bars Clear the check box to remove the mini bar from the values. ✘ ✘ ✘ ✓ -
Select the Counters tab and perform the following steps
to remove, move, or hide the counters in the graph and set the
Cumulated value:
-
Click the Time Ranges drop-down list and select the
following options to display the data in the graph either for the entire run or
number of users specified in the schedule:
Option Description Entire run Select the check box to display the graph for the test for the entire run. X Users Select the check box to display the graph for the number of users specified in the schedule. Where X is the number of users specified while creating in the schedule.