Background tests

A background test simply runs the selected test repeatedly while the performance test is active.

The only execution options to configure are these two:
  • Whether the performance test should be stopped if the Rational® Integration Tester test fails (the Terminate on failure check box)
  • The number of copies (instances) of the test that will be executed (the Instances field)