Jump to main content
IBM Logo Product Documentation
  • Products
  • Support
Workload Automation 10.2.4
  1. Home icon
  2. Welcome
  3. IBM Z Workload Scheduler

    Welcome to the IBM Z Workload Scheduler documentation, where you can find information about how to install, maintain, and use the product. The documentation has been updated for version 10.2 SPE (Revised April 2025).

  4. Planning and Installation
  5. Installing and migrating IBM Z Workload Scheduler
  6. Installing

    zos/src_inst/eqqi1installing.html#installing__itasks summarizes the tasks to install IBM Z Workload Scheduler and identifies the address space type for each of them. Depending on your configuration, you might not need to perform every task indicated in the table. Skip those sections that are not relevant to your installation.

  7. Step 17. Activating support for the product dialog and programming interface using the server
  8. Defining VTAM® resources for the server

  • Product requirements

    This section contains links to the IBM® Workload Scheduler Download Documents, System Requirements, and Release Notes.

  • Product Library in PDF format

    This section contains links to the PDF versions of all the publications provided in IBM Documentation for IBM Workload Automation.

  • Considerations for GDPR readiness
  • Overview
  • Mobile Applications Userʼs Guide
  • Dynamic Workload Console User's Guide
  • AI Data Advisor (AIDA) User's Guide
  • Scheduling Job Integrations with IBM Workload Automation
  • IBM® Workload Scheduler

    Welcome to the IBM® Workload Scheduler documentation, where you can find information about how to install, maintain, and use IBM Workload Scheduler. The documentation has been updated for IBM Workload Scheduler Version 10.2.4.

  • IBM Z Workload Scheduler

    Welcome to the IBM Z Workload Scheduler documentation, where you can find information about how to install, maintain, and use the product. The documentation has been updated for version 10.2 SPE (Revised April 2025).

    • Memo to Users
    • Program Directory
    • Dynamic Workload Console Readmes

      For the latest information about a Dynamic Workload Console fix pack, see the appropriate Readme File.

    • Planning and Installation
      • About this publication
      • Planning
      • Installing and migrating IBM Z Workload Scheduler
        • Installing

          zos/src_inst/eqqi1installing.html#installing__itasks summarizes the tasks to install IBM Z Workload Scheduler and identifies the address space type for each of them. Depending on your configuration, you might not need to perform every task indicated in the table. Skip those sections that are not relevant to your installation.

          • Step 1. Loading tracker software
          • Step 2. Loading controller software
          • Step 3. Loading national language support software
          • Step 4. Using the EQQJOBS installation aid
          • Step 5. Adding SMF and JES exits for event tracking
          • Step 6. Updating SYS1.PARMLIB
          • Step 7. Setting up the RACF® environment
          • Step 8. Securing communications
          • Step 9. Allocating data sets
          • Step 10. Creating JCL procedures for address spaces
          • Step 11. Defining the initialization statements
          • Step 12. Setting up the ISPF environment
          • Step 13. Using XCF for communication
          • Step 14. Activating the network communication function
          • Step 15. Using TCP/IP for communication
          • Step 16. Activating support for the API
          • Step 17. Activating support for the product dialog and programming interface using the server
            • Defining VTAM resources for the product dialog and program interface using the server
            • Defining VTAM® resources for the server
              • Defining a local LU for the server
              • Defining logon modes for the server
            • Updating APPC options for the server
            • Defining VTAM® resources in a parallel sysplex
            • Starting the server
          • Step 18. Activating support for end-to-end scheduling with z-centric capabilities
          • Step 19. Activating support for Dynamic Workload Console
          • Step 20. Activating support for the Java™ utilities
          • Step 21. Activating support for FIPS standard over SSL secured connections
        • Verifying your installation
        • Migrating

          This topic provides information to help you plan your migration from IBM Z Workload Scheduler versions 9.5 and 10.1 to version 10.2.

      • Installing Dynamic Workload Console and Z connector

        How to install, upgrade, configure, and uninstall the Dynamic Workload Console and Z connector, which is automatically installed with a Dynamic Workload Console instance.

      • Deploying with containers

        Docker is a state-of-the-art technology that creates, deploys, and runs applications by using containers. Packages are provided containing an application with all of the components it requires, such as libraries, specific configurations, and other dependencies, and deploy it in no time on any UNIX, Windows, and Linux on Z workstation, regardless of any different settings between the source and the target workstation.

      • Deploying AI Data Advisor

        You can deploy AI Data Advisor (AIDA) by using Docker or Kubernetes.

      • Installing IBM Z Workload Scheduler Agent (z-centric)

        The following topics describe how to install, migrate, and uninstall the IBM Z Workload Scheduler Agent (also known as z-centric agent).

      • Installing IBM Z Workload Scheduler Agent on IBM i systems
      • Integrating Workload Automation with Zowe™

        Zowe™ is an open source project that enables you to interact with z/OS through modern interfaces. You can issue Workload Automation commands through the Zowe command-line interface (CLI), and access Workload Automation REST APIs through the Zowe API Mediation Layer (ML).

      • Sample library (SEQQSAMP)

        The SEQQSAMP library contains samples to help you install, migrate, and customize IBM Z Workload Scheduler.

      • Invoking the EQQEXIT macro
      • Invoking the EQQLSENT macro
    • Customization and Tuning
    • Managing the Workload

      You can plan when and how your workload runs and manage it as part of a plan.

    • Scheduling End-to-end with z-centric Capabilities
    • Quick Reference
    • Diagnosis Guide and Reference
    • Workload Automation Programming Language for z/OS User's Guide and Reference
    • Driving IBM Z Workload Scheduler
  • Messages and Codes
  • Glossary
  • Notices
 Feedback

Defining VTAM® resources for the server

Start by defining the associated VTAM resources for the server:
  • Defining a local LU for the server
  • Defining logon modes for the server

Then follow the instructions provided in Updating APPC options for the server and Defining VTAM resources in a parallel sysplex.

  • Share: Email
  • Twitter
  • Disclaimer
  • Privacy
  • Terms of use
  • Cookie Preferences