Restoring the Operator Instruction (OI) data set

About this task

To restore the OI data set:
  1. Stop IBM Z Workload Scheduler.
  2. Allocate a new OI data set.
  3. Copy the backup data set to the OI data set.
  4. If you allocated the data set with a new name, update all JCL (ddname EQQOIDS) to reference the new OI data set.
  5. Start IBM Z Workload Scheduler.
  6. Enter the Operator Instruction dialog to verify that instructions are correctly defined. All instructions added since the OI backup was created must be added again.