Migrating the production environment
To migrate your production system, perform the following steps:
- If you migrate your z/OS operating system to a newer version, reassemble the SMF and JES exits mentioned in Add SMF and JES event tracking exits with the libraries of the new operating system.
- Install the new release of the IBM Workload Scheduler Agent for z/OS.
- Close down your IBM Workload Scheduler Agent for z/OS
production system:
- From the master production system, set limit=0 to the Agent Workstation on IBM Workload Scheduler Agent for z/OS master domain manager.
- Wait until no jobs are in execution and stop the IBM Workload Scheduler Agent for z/OS.
- Edit the Started Task (job) of the production by changing the following DD statement pointing to
the data sets installed with the new release of:
- EELMLIB
- STEPLIB
- EELJCLIB
- Allocate the JCLIB running the EELINST
- Specify BUILDSSX (rebuild) and SSCMNAME (EELSSCMN, PERMANENT) in TWSOPTS parameters.
- Before the next IPL of the system, remove the BUILDSSX and SSCMNAME keywords from the agent initialization statements.