Recovering with the use of the ResetPlan command

Perform these steps on the master domain manager:
  1. Set the job "limit" to “0”, using conman or the Dynamic Workload Console.

    This prevents jobs from launching.

  2. Shut down all IBM Workload Scheduler processes on the master domain manager.
  3. Run ResetPlan -scratch.
  4. Run JnextPlan, setting the -from and -to parameters to cover the period for which there are still outstanding jobs.
  5. Check the created plan and ensure that you want to run all the instances it contains, deleting those that you do not want to run.
  6. Reset the job "limit" to the previous value. The Symphony file is distributed and production recommences.