Jump to main content
IBM Logo Product Documentation
  • Products
  • Support
Workload Automation 10.1.0
  1. Home icon
  2. Welcome
  3. IBM® Z Workload Scheduler

    Welcome to the IBM® Z Workload Scheduler documentation, where you can find information about how to install, maintain, and use the product.

  4. Planning and Installation
  5. Installing IBM® Z Workload Scheduler
  6. Migrating

    This chapter provides information to help you plan your migration from IBM Z Workload Scheduler versions 9.3 and 9.5 with APAR PH30466 installed, to version 10.1 Fix Pack 6.

  7. Migrating actions
  8. Migrating the production environment

  • Product requirements

    This section contains links to the IBM® Workload Scheduler Download Documents, System Requirements, and Release Notes.

  • Fix Pack readmes

    For the latest information about a Fix Pack, see the appropriate Readme File.

  • Product Library in PDF format

    This section contains links to the PDF versions of all the publications provided in IBM Documentation for IBM Workload Automation.

  • Considerations for GDPR readiness
  • Overview
  • Mobile Applications Userʼs Guide
  • Dynamic Workload Console User's Guide
  • AI Data Advisor (AIDA) User's Guide
  • Scheduling Job Integrations with IBM Workload Automation
  • IBM® Workload Scheduler

    Welcome to the IBM® Workload Scheduler documentation, where you can find information about how to install, maintain, and use IBM Workload Scheduler. The documentation has been updated for IBM Workload Scheduler Version 10.1 Fix Pack 6.

  • IBM® Z Workload Scheduler

    Welcome to the IBM® Z Workload Scheduler documentation, where you can find information about how to install, maintain, and use the product.

    • Memo to Users
    • Program Directory
    • Dynamic Workload Console Readmes

      For the latest information about a Dynamic Workload Console fix pack, see the appropriate Readme File.

    • Planning and Installation
      • About this publication
      • Planning
      • Installing IBM® Z Workload Scheduler
        • Installing

          This chapter describes the tasks you perform to install IBM Z Workload Scheduler.

        • Verifying your installation

          What to consider when verifying your installation.

        • Migrating

          This chapter provides information to help you plan your migration from IBM Z Workload Scheduler versions 9.3 and 9.5 with APAR PH30466 installed, to version 10.1 Fix Pack 6.

          • Planning for migration
          • Migrating actions
            • Migrating data sets
            • Migrating the production environment
              • Close down your production system
              • Convert VSAM files to the new system format
              • Initialize the new system
              • Produce a checkpoint data set containing data from the old production system
              • Start the new system
              • Validate the new system
          • Migrating the controller with the IWSZSELFUPGRADE application
          • Installing or upgrading the IBM® Z Workload Scheduler agent automatically
          • Performing fallback
      • Installing Dynamic Workload Console and Z connector
      • Deploying with containers

        Getting started with containers

      • Deploying AI Data Advisor

        You can deploy AI Data Advisor (AIDA) by using Docker or Kubernetes.

      • Installing IBM Z Workload Scheduler Agent (z-centric)

        How to install, migrate, and uninstall the IBM Z Workload Scheduler Agent (also known as z-centric agent).

      • Installing IBM Z Workload Scheduler Agent on IBM i systems

        Installing IBM Z Workload Scheduler Agent on IBM i systems

      • Integrating Workload Automation with Zowe™

        Zowe™ is an open source project that enables you to interact with z/OS through modern interfaces. You can issue Workload Automation commands through the Zowe command-line interface (CLI), and access Workload Automation REST APIs through the Zowe API Mediation Layer (ML).

      • Sample library (SEQQSAMP)

        The SEQQSAMP library contains samples to help you install, migrate, and customize IBM Z Workload Scheduler.

      • Configuration examples
      • Invoking the EQQEXIT macro
      • Invoking the EQQLSENT macro
    • Customization and Tuning
    • Managing the Workload

      You can plan when and how your workload runs and manage it as part of a plan.

    • Scheduling End-to-end with z-centric Capabilities
    • Scheduling End-to-end with Fault Tolerance Capabilities
    • Quick Reference
    • Diagnosis Guide and Reference
    • Workload Automation Programming Language for z/OS User's Guide and Reference
    • Driving IBM Z Workload Scheduler
  • Messages and Codes
  • Glossary
  • Installing IBM® Workload Scheduler
  • How to monitor your IBM® Workload Scheduler using the Dynamic Workload Console
  • How to create your scheduling environment using the Dynamic Workload Console
  • Notices
 Feedback

Migrating the production environment

To migrate your production system, perform the following steps:

  1. Close down your production system
  2. Convert VSAM files to the new system format
  3. Initialize the new system
  4. Produce a checkpoint data set containing data from the old production system
  5. Start the new system
  6. Validate the new system
  • Share: Email
  • Twitter
  • Disclaimer
  • Privacy
  • Terms of use
  • Cookie Preferences