Running tests and stubs

After you created tests and stubs in Rational® Integration Tester for the applications deployed on the IBM® App Connect Enterprise integration node by using the synchronization feature, you can run the tests and stubs.

Before you begin

You must have created tests and stubs for the applications deployed on the IBM® App Connect Enterprise integration node by using the synchronization feature. See Synchronizing Rational Integration Tester with the IBM App Connect Enterprise integration node.

You must have opened the Test Factory view to perform this task.

If you completed the synchronization with IBM® App Connect Enterprise, the Test Factory view is displayed with the tests that were created.Image of the Summary window.

Procedure

  1. Select the test or stub that you want to run.
  2. Right-click the test or stub and select Run.
    The selected test or stub runs, and the Test Lab view is displayed with the results of the run.
    Note: You can select one or multiple tests or stubs that were created and run the tests or stubs.

Results

You have run tests and stubs that were created for testing the IBM® App Connect Enterprise applications.