Background tests
A background test simply runs the selected test repeatedly while the performance test is active.
The only execution options to configure are these
two:
- Whether the performance test should be stopped if the Rational® Integration Tester test fails (the Terminate on failure check box)
- The number of copies (instances) of the test that will be executed (the Instances field)