Running a configured schedule

If you do not use the default launch configuration, you can configure the schedule and then run it.

Before you begin

You must configure the schedule before you run it. For more information, see Setting a launch configuration.

Procedure

  1. In the Test Navigator, expand the project until you locate the schedule.
  2. Right-click the schedule, and then click Run > Run.
  3. In the Configurations area on the left, click Test Schedule, and then click the name of the schedule to run.
  4. Click Run.

Results

While the schedule is running, the reports are updated in real time, and you can see the changes.