Working with Rational® Integration Tester resources in IBM® Engineering Test Management

After the IBM® Rational® Integration Tester-Engineering Test Management integration is complete, you can export tests and test suites from Rational® Integration Tester into Engineering Test Management. Exported tests and test suites are created as test cases and test scripts in Engineering Test Management.

Before you can use the links in the test output in Engineering Test Management, you must publish the details of your results database connection from the IBM® Rational® Integration Tester project that contains the test case to Rational® Test Control Panel. Do this task by clicking Publish results database connection in the Project Settings dialog. For more information, see Project settings. Publishing the results database connection is mandatory for every project on the following occasions:
  • After you configure the results database, but before you attempt to view results in Rational® Test Control Panel. For more information about configuring the results database, see Configuring the project results database.
  • After updating the results database settings.
If you do not publish the details, the link (in the test output displayed in Engineering Test Management) to the Results Gallery in Rational® Test Control Panel does not work.

Navigating Engineering Test Management

Rational® Integration Tester resources can be viewed in the Construction menu of the Engineering Test Management console, as Test Cases and Test Scripts.

Construction menu of Engineering Test Management

Database connection

The Rational® Integration Tester Agent, when it is running, can be seen as an Engineering Test Management Adapter by selecting Adapter Console from the Execution module.

Adapter console menu