Working with integration test artifacts in HP Quality Center
You can create tests in HP Quality Center by using the GH-Tester test type. You can also link Rational® Integration Tester tests to HP Quality Center tests with the Quick Link tool.
Before you can use the links in the test output
in
Rational® Quality
Manager, you must publish
the details of your results database connection from the IBM®
Rational® Integration
Tester project that contains
the test case to
Rational® Test Control
Panel. Do
this task by clicking Publish results database connection in
the Project Settings dialog. For more information, see Project settings. Publishing the results database
connection is mandatory for every project on the following occasions:
- After you configure the results database, but before you attempt to view results in Rational® Test Control Panel. For more information about configuring the results database, see Configuring the project results database.
- After updating the results database settings.
Navigating HP Quality Center
You create tests in the Test Plan module, and then create test sets and add tests to them in the Test Lab module. Test sets are collections of tests, similar to test suites in Rational® Integration Tester. You also run tests and view the execution results in the Test Lab module.
Note: When the automatic deployment option in Quality Center is enabled, clients that
are accessing the server must have local administrator privileges to download and install plug-in
files. If the client browser fails to load these files or hangs, verify that the current user
account has the appropriate privileges.