Working with Rational® Integration Tester resources in IBM® Engineering Test Management
After the IBM® Rational® Integration Tester-Engineering Test Management integration is complete, you can export tests and test suites from Rational® Integration Tester into Engineering Test Management. Exported tests and test suites are created as test cases and test scripts in Engineering Test Management.
- After you configure the results database, but before you attempt to view results in Rational® Test Control Panel. For more information about configuring the results database, see Configuring the project results database.
- After updating the results database settings.
Navigating Engineering Test Management
Rational® Integration Tester resources can be viewed in the Construction menu of the Engineering Test Management console, as Test Cases and Test Scripts.
Database connection
The Rational® Integration Tester Agent, when it is running, can be seen as an Engineering Test Management Adapter by selecting Adapter Console from the Execution module.