Configuring references
You can configure a performance test to run scenarios, which are collections of stubs, that are available on the IBM® Rational® Test Control Panel domain associated with your Rational® Integration Tester project.
About this task
- Load the configuration of a scenario saved on a Rational® Test Control Panel domain into the currently selected performance test, overwriting any conflicting stubs that are already configured.
- Modify the configuration of the that scenario.
- Run the scenario on Rational® Test Control Panel when you run the performance test.
- To ensure that the connection is working correctly, click Project > Project Settings on the menu bar, click the Server Settings tab on the Project Settings window, and verify that a green tick icon is displayed next to the URL field on the Rational® Test Control Panel area of the tab. If there is no URL displayed or if there is a red cross icon next to the URL field, you should contact your project administrator.
- To ensure that your project is connected to the relevant domain, click (if necessary) the relevant domain in the Domain list on the Rational® Test Control Panel area of the Server Settings tab.
- Click OK to save any changes.
Procedure
- Optional: On the References tab, select the Lock environment check box if you want to prevent Rational® Test Control Panel users from starting or stopping stubs in the relevant execution environment while you are running the currently selected performance test.
- On the References tab, click Load
scenario.
The Load scenario from Rational® Test Control Panel window is displayed.
Note: If Rational® Test Control Panel is not running or if your project is not configured with the correct Rational® Test Control Panel URL, the Load scenario button is unavailable. - In the Scenario list, click the
relevant scenario.Note: Only scenarios that are available under the domain that is configured for your project are available.
- Specify how operations not satisfied by the selected scenario will be handled. Options are as follows:
- Do not change (default): Any operations that are not assigned a stub by the scenario that is loaded from Rational® Test Control Panel keep their existing selection.
- Clear selection: Selections are cleared for any operations that are not assigned a stub by the scenario that is loaded from Rational® Test Control Panel.
- Set to Live System: Selections are changed to "Live System" for any operations that are not assigned a stub by the scenario that is loaded from Rational® Test Control Panel, which means that all traffic goes to the live system.
- Optional: Select the Include non-referenced stubs check box.
- Click OK.
The selected scenario is loaded into your project and displayed on the References tab.
Note: Only Stub response time configuration and agent attributes are imported from the selected Rational® Test Control Panel scenario. Other stub configuration properties, such as input tags, behavior properties, or logging settings are not imported. - Review the information displayed about the scenario.
Column Description Reference
Any referenced operations for the stubs within the selected scenario.
Note: By default, the table on the References table is sorted in ascending order by using the Reference column. To change the sort, or to sort by any other column, click the title of the wanted column, sorting cycles through ascending, descending, and no sort as you click.Satisfied by
If a referenced operation can be stubbed, clicking the cell under Satisfied by displays a list that contains the following options:- Blank: Selecting this option means that
no changes are made to anything currently running in Rational®
Integration Tester.Note: This option is useful if you are working with nested scenarios and you want to prevent the tearing down of any stubs in a parent scenario.
- Live System: Selecting this option stops any stubs that are running for this operation either in Rational® Integration Tester or in the execution environment in Rational® Test Control Panel when the scenario is executed.
Location & version
If a stub is selected under Satisfied by for a referenced operation, clicking the cell under Location & version displays a list that contains the following options:- Local
- Remote Stub version number
A remote stub is a stub that was previously published from Rational® Integration Tester to Rational® Test Control Panel. The stub version number that is displayed refers to the version number specified when it was published. Only stub versions that are published to the domain associated with the current project are available.
Config
If a stub is selected under Satisfied by for a referenced operation, clicking the cell under Config opens the Stub Configuration window.
Note: Stub response time configuration and agent attributes are imported from the selected Rational® Test Control Panel scenario but other stub configuration is not imported.Using the Response times tab, you can override response time settings that are configured in the currently selected stubs properties.
Using the Agents tab, you can override agent settings for the currently selected stub:- In the Number of agents to start the stub on field, you can overwrite the value displayed.
- In the Agent attributes field, you can overwrite the attributes or insert additional attributes in a comma-separated list.
- Blank: Selecting this option means that
no changes are made to anything currently running in Rational®
Integration Tester.
- Click OK.
- Save and run the currently selected performance test.
Results
The Task Monitor and Console windows in the Test Lab perspective are displayed. Verify that the test starts.
- Any stubs that were running on the selected execution environment in Rational® Test Control Panel stop for
any operations in the scenario where Live System or a stub was
selected.Note: In the Environments Dashboard of Rational® Test Control Panel, verify that the relevant stubs are started on the selected execution environment. To verify which agents are running the stubs, navigate to the Infrastructure Dashboard, identify the agent from its name under the Identity column and check the Status to be displaying as CONNECTED for a running agent.
- The selected execution environment in Rational® Test Control Panel is locked if you selected the Lock environment check box on the References tab.
- Any stub or stubs that are linked to the scenario are executed.
- When the scenario finishes, all stubs (both remote and local) that it started are stopped.