Test approach
The IBM® Rational® Test Workbench product suite fits easily into a V-Model approach. The classic V-Model demonstrates each phase in predevelopment and its associated phase in test planning. For example, when the system design is delivered, begin planning for system testing. Testing activities such as design, analysis, planning and execution must happen throughout the entire project life cycle.
During the system design phase, integration architects can make
design-time assets available, such as a WSDL document or an XSD. These
assets can be synchronized with Rational®
Integration Tester to enable early
visibility of testing complexity and scope. This process is an essential
part in planning your integration testing effectively and provides
early visibility of complexity and risk.