Rational Team Concert

You can use IBM® Rational® Team Concert as your software configuration management system to maintain functional test assets.

Using Engineering Workflow Management, you can share projects, scripts, script templates, test datasets, and object maps across the testing team. You can manage changes in test assets in a collaborative manner to track the changes efficiently.
Note: The integration of IBM Rational® Functional Tester with Engineering Workflow Management is not supported in .NET.

Engineering Workflow Management must be purchased separately. You must install Engineering Workflow Management using Installation Manager and then install Rational® Functional Tester using the same package group to integrate Engineering Workflow Management with Rational® Functional Tester.

With Engineering Workflow Management, you can manage test assets and perform source control operations such as these:

  • Check-in files from your local workspace to your repository workspace.
  • Make changes to the contents of your local workspace and check-in the files so that the local workspace and repository workspace contain the same versions of the files. In the repository workspace, related changes are collected as change sets so that changes in multiple files and folders can be committed in a single operation.
  • Deliver the change sets to a stream so that the content in the repository workspace is made available to other team members.
Note: When you perform source control operations in the Functional Test Projects, the results might be inconsistent. Perform all source control operations such as check-in and deliver from the Pending Changes view.

For more information on Jazz source control and Jazz concepts for Rational ClearCase® users, see the Rational Team Concert information center.