Changing the stage duration during a run
Increase or decrease the duration of the current stage during a schedule run. You can change the duration of a stage that is set to run for a specified time, but not for a stage that is set to run until the work is complete. You can change the duration of a stage when the status is Running, but not when the status is Ramping or Settle Time.
Before you begin
Procedure
- From the test editor, click Run Test. The execution report is opened either in the internal or external browser, and the state of the run is shown as Running.
- During the run, click .
- In the Change Stage Duration window, type the new stage duration in Run for specified period of time. Type a value that is longer than the amount of time that has elapsed for the current stage. Use the list to change the time units.
-
Click Change.
The duration of the current stage changes.