Running multiple Rational® Integration Tester tests in Rational® Quality Manager
To run multiple Rational® Integration Tester tests in IBM® Rational® Quality Manager, you must first enable parameter passing with Rational® Quality Manager, and then configure the tests in Rational® Integration Tester with the appropriate input and output parameters.
About this task
Procedure
- To enable parameter passing with Rational® Quality Manager, you must export two or more Rational® Integration Tester tests to Rational® Quality Manager, and then create a Rational® Quality Manager test suite.
- Configure all of the tests in Rational® Integration Tester with the appropriate input and output parameters. For example, for a parameter to be passed from Test A to Test B, Test B must have an input parameter with the same name as the output parameter from Test A.
- Export the tests to Rational® Quality Manager, create an Rational® Quality Manager test suite, and add all of the tests to the suite in order.
- Disable parallel processing of the tests, and enable Passing of execution variables between scripts. This can be done at run time in the Rational® Quality Manager user interface.