Running multiple Rational® Integration Tester tests in Rational® Quality Manager

To run multiple Rational® Integration Tester tests in IBM® Rational® Quality Manager, you must first enable parameter passing with Rational® Quality Manager, and then configure the tests in Rational® Integration Tester with the appropriate input and output parameters.

About this task

To be able to run multiple tests in Rational® Quality Manager:

Procedure

  1. To enable parameter passing with Rational® Quality Manager, you must export two or more Rational® Integration Tester tests to Rational® Quality Manager, and then create a Rational® Quality Manager test suite.
  2. Configure all of the tests in Rational® Integration Tester with the appropriate input and output parameters. For example, for a parameter to be passed from Test A to Test B, Test B must have an input parameter with the same name as the output parameter from Test A.
  3. Export the tests to Rational® Quality Manager, create an Rational® Quality Manager test suite, and add all of the tests to the suite in order.
  4. Disable parallel processing of the tests, and enable Passing of execution variables between scripts. This can be done at run time in the Rational® Quality Manager user interface.