Adding a JMeter test to an existing VU schedule

You can add a JMeter test to an existing VU schedule to test the performance of both static and dynamic resources and web applications.

About this task

When you add a JMeter test to a VU schedule, a user group with a loop is created and this loop contains the JMeter test invocation.

Procedure

  1. In the Test Navigator, browse to the schedule and double-click it. The schedule editor opens.
  2. In the VU schedule editor, right-click the Schedule, and then click Add > JMeter Test.
  3. In the Select Tests window, expand the project name and JMeter Tests folder and choose the test that you want to add.
  4. Click OK. A new User Group with a loop that contains the JMeter test invocation is created.

What to do next

You must run the schedule or compound test, to view the statistics on the executed sequences.